Using JMRI® to Operate Trains
Operations Trains Window
The Trains window opens which allows you to build trains to run on your layout using the assets that you have defined in this program and save to the various rosters.. This window is selected from the DecoderPro® or PanelPro™ main page from Tools --> Operations --> Trains menu or if enabled Operations --> Trains menu.
Menu Bar
The main bodyLists of all the trains that have been built. Each train has a Preview, Move and Edit button associated with it.
Time or Id (depends upon Show option at bottom of window)
column shows the departure time of the train
Build column is checked to include in
current build
Function column, Click on the Build button
and Preview button is displayed in Function, click on Preview
function button and it opens the Print Preview window
showing the trains Manifest. If Build button is displayed, then
it will build the train and display a Preview button.
Name column shows train name
Description column describes the trains
routing
Route column shows actual train route
Departs column shows location of
departure
Terminates column shows the terminal
location
Current column shows current location
Status column shows status of train
Action column shows Move button Each time pressed
advances one location on the trains route until it will be
finally terminated.
Edit column contains the Edit button which opens the
Edit Train
window
At the bottom of the Trains window:
Show selects if time or Id is shown in first
column.
(click on a column header for sort by sequence)
Options (selects the options desired for the
train list)
Show All Messages Build Reports
Preview Manifests
Action
Move Conductor Terminate
Reset
opens the Add
Train window.
the selected train
is built
and the Function column button changes to
Preview when completed, messages may be
displayed if the Build can not be completed.
shows the manifest in Preview window.
opens the
Switch Lists by
Location window.
terminates all trains that have a build.
saves the builds to disk.